Permit to work. A printable permit to work for contractors on an estate — hot work, electrical isolation, confined space, roof access and work that could disturb asbestos.
This is the paper version. FacilityOptix does the same job on a phone, with the record filed against the building and the asset automatically.

What is on the sheet
- Permit number, building, exact location, the work and who is doing it
- Permit type, so one form covers the common cases without pretending they are the same job
- Isolations made, by whom, and the record that they were restored
- Confirmation the asbestos register was consulted and issued before work started
- Precautions required, systems affected, and who else in the building has been told
- Validity with times rather than durations, and a hand-back block that closes the permit by name
Why this record matters
A permit on an estate does a job a permit on a construction site does not: it protects the people already in the building. The occupants are the reason detection gets isolated, the reason a riser cannot simply be closed off, and the reason somebody has to be told before the water goes off on a Thursday afternoon.
The asbestos line is on the permit rather than only on the approval checklist because the moment that matters is this one. A contractor approved six months ago, drilling a wall today, needs the register for this building in front of them now — and a permit is the last point at which anybody can ask.
Isolations are the recurring failure. A detection zone covered for hot work, a riser valve closed, a circuit locked off: each is a window in which the building is not what its own risk assessments assume, and a permit that records the isolation but not the restoration has documented the window and not its closing.
Times rather than durations, throughout. How long a permit may run and how long a fire watch continues after hot work is for whoever is competent to set it in that building, and a printed period on a free form becomes the period everybody uses.
Use it with
- Contractor approval checklistA printable checklist for approving a contractor onto an estate — insurance, accreditation, competence for the actual work, and what they have to produce before anybody sets foot on site.
- Asbestos register and management planA printable asbestos register and management plan pro-forma — what is known to be present or presumed, its condition, who has been told and what happens before any work starts.
- Work order formA printable work order — what was reported, what was actually found, what was done, what it needs next and the sign-off that closes it.
- Statutory compliance checklistA printable checklist of the statutory obligations attaching to a building — what applies, who holds it, when it was last satisfied and where the evidence is.
Read more on this
© 2026 FacilityOptix. Free to print, copy and use in your business. Not for resale. Please keep this notice.
Contains public sector information licensed under the Open Government Licence v3.0. General guidance, not legal advice. Checked October 2026.