Work order form. A printable work order — what was reported, what was actually found, what was done, what it needs next and the sign-off that closes it.
This is the paper version. FacilityOptix does the same job on a phone, with the record filed against the building and the asset automatically.

What is on the sheet
- Work order number, building, asset reference and who raised it
- What was reported, in the words of the person who reported it
- Priority and target response, taken from your own service levels rather than printed here
- What was found on attendance, which is frequently not what was reported
- Work carried out, parts used, time on site and whether the job is complete
- Follow-on work required, with an owner, and a sign-off from somebody other than the person who did the work
Why this record matters
The gap between what was reported and what was found is the most useful information a facilities team collects, and most work order forms have one field where there should be two. 'Radiator cold' is a report; 'system pressure low, leak on third floor riser' is a finding, and only the second one tells you there is a bigger problem.
Follow-on work is the field that stops a reactive team running in circles. An engineer who makes something work today and notices it will fail again in a month has information nobody will ever have again, and a form with nowhere to put it loses it every single time.
The sign-off is deliberately not the person who did the work. Self-certified completion is how a job gets closed because the engineer left site, rather than because the problem was fixed, and the difference shows up as the same work order raised again a fortnight later.
Response targets are a field, not a printed table. They come from your own contracts and service levels, they differ by building and by priority, and a printed target on a free form becomes the target everybody is measured against whether or not anybody agreed it.
Use it with
- PPM schedule templateA printable planned preventive maintenance schedule — what is attended, when it is next due, who does it and what evidence comes back.
- Asset register templateA printable asset register — what you have, where it is, what state it is in, what it is worth to you if it fails and what maintenance regime it sits under.
- Permit to workA printable permit to work for contractors on an estate — hot work, electrical isolation, confined space, roof access and work that could disturb asbestos.
- Building condition inspectionA printable building condition inspection — a structured walk of the fabric, the plant and the shared areas, recording what is deteriorating before it becomes a work order.
Read more on this