NEWRecognition — recognise hard work and the people going above and beyond
FacilityOptixFacilities software
Features

Contractor management for facilities and maintenance teams Who you use, what they are approved to do, and whether their insurance and accreditations are still valid — checked before the job, not after the incident.

Modules: Contractors

Expiry is the whole problem

Contractor control fails in one specific way: a certificate that was valid when the contractor was approved, and is not valid on the day they attend. Nobody notices, because nothing was watching the date. A register that tracks expiry turns an annual paperwork exercise into a standing check, and it is the difference between saying a contractor was approved and being able to show they were approved on the day in question.

  • Contractor details, trades and geographic coverage in one register
  • Public liability, employer's liability and accreditation expiry dates tracked
  • Expiring documents surfaced before the date rather than after it
  • Job history per contractor, so performance is visible over time

Approved for what, exactly

Approval is rarely blanket. A contractor competent on ventilation is not thereby competent on lifting equipment, and an insurer looking at an incident will ask what the approval actually covered. Recording trades and coverage against the contractor — rather than a single approved flag — keeps that distinction where it can be used.

Permits to work: what this does and does not do

FacilityOptix is honest about this boundary. It holds the contractor register, the competence and insurance evidence behind an authorisation, and the work order the contractor attended against — which is most of the documentary record a permit regime depends on. It does not issue permits to work, run a hot works or confined space authorisation workflow, or hold electronic permit sign-off. Teams running a formal permit system operate it alongside FacilityOptix rather than inside it.

  • Held here: contractor competence, insurance, accreditation and job history
  • Held here: the work order the attendance was made against, with its evidence
  • Not held here: permit issue, hot works authorisation, electronic permit sign-off

What it gets you

No lapsed contractor on site

The question is not whether the certificate exists, but whether it was in date on the day. That is a date field doing a job, not a filing habit.

Performance becomes visible

Job history per contractor turns an opinion about who is reliable into something with dates behind it.

The evidence survives the handover

When the manager who approved a contractor moves on, the basis for that approval stays on the record.

What this does not do
  • No permit to work issue or electronic permit sign-off
  • No contractor invoicing, rate cards or purchase orders
  • No automated verification against external accreditation registers — expiry dates are held from the documents you upload

The full version of this, module by module, is on the service specification.

Questions about contractors & permits

Does FacilityOptix issue permits to work?
No. It holds the contractor competence and insurance evidence a permit regime relies on, and the work order the contractor attended against, but permit issue and authorisation sign-off happen in your own permit system.
Are we warned before insurance expires?
Yes. Expiry dates are tracked against the contractor record and surface ahead of the date, which is the point at which doing something about it is still cheap.
Can contractors log in and update their own documents?
The register is maintained by your team. If self-service contractor document upload is a requirement for you, say so during a demo rather than assuming it — this page is written to be accurate about what exists today.

See it running on your own buildings.

A live demo on your data, not a slide deck — most teams are live within a week.

Try for free