Work order management software for facilities teams Reactive jobs from report through to sign-off, with the priority and the response time visible while there is still time to act on them.
Modules: Work Orders
Every job has one record, from the first report
The expensive failure in reactive maintenance is not a slow fix. It is a job that exists in four places — a phone call, a text to an engineer, a note on a desk and a line in a spreadsheet — none of which agree, and none of which can be produced afterwards. One record from the moment the job is raised is what makes response times measurable and history worth keeping.
- Jobs raised by staff, tenants or directly from an inspection finding
- Assigned to an in-house engineer or an external contractor from the same screen
- Priority and target response held on the job, not in someone's head
- Photos, notes and sign-off captured against the job as it progresses
Findings become jobs without re-typing
An inspection that discovers a defect and produces a PDF has done half the work. The other half — someone reading the PDF, deciding it matters, and raising a job — is where things are lost. A finding raised during a statutory check becomes a work order carrying its own origin, so the trail runs from the check that found it to the job that fixed it.
Backlogs have causes, not just sizes
A growing work order backlog is a symptom. The useful diagnosis is whether jobs are arriving faster than capacity, sitting unassigned, waiting on a contractor, or being completed but never closed off. Those are four different problems with four different fixes, and they are only distinguishable if the job record carries its own timeline.
- Time in each state visible, not just total age
- Unassigned and awaiting-contractor separated from genuinely in progress
- Job history kept per building and per contractor
What it gets you
Response times are measured, not estimated
A target response that nothing checks against is a sentence in a contract. Here it is a field on a record with a clock against it.
The tenant question has an answer
When someone asks what happened to the job they reported in March, the answer takes seconds rather than an afternoon.
Nothing falls between inspection and repair
Findings raised during a check carry through to the work that resolves them, with the link intact.
- No contractor invoicing, purchase orders or job costing
- No tenant-facing billing or service charge apportionment
- No live engineer GPS tracking or dispatch optimisation
The full version of this, module by module, is on the service specification.
Questions about work orders
- Can tenants or staff raise jobs directly?
- Yes. Jobs can be raised by staff and tenants as well as by the facilities team, and they land on the same record an engineer works from rather than in a separate mailbox.
- Can we send a job to an external contractor?
- Yes. A job can be assigned to a contractor on your register in the same way as to an in-house engineer, and the history stays with the job either way.
- Does it handle job costs?
- No. FacilityOptix deliberately stops short of finance — there is no purchase ordering, invoicing or job costing. It records what was done and when, and leaves the money to your finance system.
Planned maintenance
PPM schedules that survive a busy week — recurring work planned against the asset, what is slipping visible before it lapses, and evidence captured at the point the job is closed.
Contractors & permits
Who you use, what they are approved to do, and whether their insurance and accreditations are still valid — checked before the job, not after the incident.
All features
The six capabilities, and the one record underneath all of them.
Pricing
One licence per company, priced on properties rather than users. Every module included.
In-house FM teams
You run the estate, you hold the duty, and there is nobody to hand the records to. A system that costs less time than it saves is the only kind worth having.
Managing agents
Several clients, several portfolios, one team — and a reporting obligation to each of them that has to be met from the same records.
FM service providers
You are measured on response times you have to be able to prove, across sites you do not control, by clients who can put the contract back out to tender.
Commercial offices
An office building is judged by its occupants continuously, and the work is funded by a service charge they can question. Both of those need a record behind them.
Retail portfolios
A retail estate is the opposite shape to a hospital: many small sites rather than a few complex ones, and nobody technical at any of them.
Building a PPM schedule that covers your statutory duties
Most teams do not lack a PPM schedule. They lack one that gets finished, and one that can be shown to cover the duties they actually hold. Here is how to build both at once.
Permits to work and contractor control
Contractor control fails in one specific way: a certificate that was valid at approval and was not valid on the day they attended. How to build a regime that notices.
See it running on your own buildings.
A live demo on your data, not a slide deck — most teams are live within a week.
Try for free